《Gold Just Snapped Back. i-80 Gold CEO Sees a 20-Year Bull Run》
CEO预计,通过完成可行性研究、4亿美元的高压釜升级以及将产量扩大至20万盎司,IAG的价值将得到提升。
这是一个完美的介绍。我们已经全面涵盖了您如何将I-80从财务崩溃的边缘拯救出来,我之前也与您讨论过各个项目。如您所知,自去年以来,我们已经为五个项目发布了初步评估报告。因此,在未来十二个月内,我们将完成这五个项目的可行性研究或初步可行性研究。
So, this is a perfect introduction. We have fully covered how you, I believe, saved the I -80 from the brink of financial collapse, and I have spoken with you previously about individual projects.
As you know, we have those five projects for which we have issued preliminary evaluation reports since last year. Therefore, we will have feasibility studies or preliminary feasibility studies for those five projects within the next twelve months.